EXPANSION
OF THE SHIP REPAIRING SECTION AND THE SHIP BUILDING WORKSHOPS
PARTS OF THE BAYS MIRNA AND BISKUPIJA
WOULD BE EMBANKED IN ORDER TO GAIN THE AREAS NECESSARY FOR THE CONSTRUCTION
OF A MARINA
PIERS FOR MOORINGS WOULD BE PLACED
ALONG THE SO FORMED SHORE
THE INTERIOR PIERS WOULD BE 2,5m
WIDE AND THE EXTERIOR PIERS PROTECTING THE WATER AREA FROM WAVES WOULD
BE 3,5m WIDE
THE EXTERIOR SIDES OF DIKES WOULD
BE USED AS BEACHES
THE MARINA CAPACITY WOULD BE:
222 MOORINGS
300m OF SHORE ON 3,0 m
400m OF PIERS, 2,5 m WIDE
365m OF PROTECTING JETTY
300m OF BEACH
1 FERRY BOAT HARBOR |